Cahokia Heights

Cahokia Heights, Illinois
St. Clair County



News

The settlement includes a proposed consent decree, which is available on the Justice Department’s website. A 60-day public comment period is in place, and instructions for submitting comments can be found in the related Federal Register notice, also posted on the Justice Department’s Proposed Consent Decree page.


Background

Cahokia Heights, home to 17,894 residents, was established in May 2021 through the merger of Cahokia, Alorton, and Centreville. The city faces significant flooding and sewage backups during heavy rains and even dry-weather sanitary sewer overflows. These challenges stem from aging infrastructure, limited maintenance, and Cahokia Heights’ location in a low-lying watershed prone to flooding.

The local sewer systems, built in the 1980s, are outdated, undersized, and poorly maintained. Many lift stations require urgent renovations, and the city lacks sufficient capacity to handle wastewater during storm events. These issues contribute to sewer backups and ongoing public health concerns.


State and Federal Regulations

Under the Clean Water Act (CWA), the National Pollutant Discharge Elimination System (NPDES) regulates wastewater discharges. Illinois EPA oversees NPDES permits and inspections for compliance. However, collection-only systems like those in Cahokia Heights are not subject to NPDES permitting.

Technical and financial assistance is available from federal and state programs to support municipal wastewater systems. Local municipalities remain responsible for developing and maintaining these systems, typically funded through user fees.


Enforcement

Illinois EPA has conducted regular inspections, responded to complaints, and collaborated with community stakeholders to address Cahokia Heights’ sewer issues. Enforcement actions include a referral to the Illinois Attorney General’s Office for violations of state environmental laws. The EPA continues to work with state and federal agencies to provide support and coordinate improvements to the city’s wastewater system and reduce the impact of stormwater runoff.

Together, these efforts aim to rebuild Cahokia Heights’ infrastructure and ensure compliance with state and federal environmental laws.


Illinois EPA Financial Assistance Projects Benefitting Cahokia Heights


Illinois EPA has issued two grants that will have a positive impact on the City of Cahokia Heights. The projects will assist with wastewater infrastructure restoration and rehabilitation and with watershed planning to identify best management practices to reduce stormwater impacts within the watershed.

Wastewater Collection and Transport Infrastructure Rehabilitation and Restoration Project

Grant Recipient – City of Cahokia Heights

WWCTIRR-Amended Grant Agreement (February 22, 2023)

Grant Period – July 25, 2022 – October 15, 2025

Grantee Award – $9,980,750.67

Grantee Match – $0

Grant Total – $9,980,750.67

Grantee Project Webpage

Map of Area

The Wastewater Collection and Transport Infrastructure Rehabilitation and Restoration Project (Project) will fund three discreet components to improve the quality of life, within the municipality of Cahokia Heights.

PROJECT COMPONENTS

Outreach activities to inform the community of the progress toward implementation of the project;

Rehabilitation and restoration construction activities for the wastewater collection and transport infrastructure system; and

Purchase of necessary equipment for current and future operation and maintenance of the wastewater collection and transport system within the project area.

PROJECT REQUIREMENTS

Support the elimination of Sanitary Sewer Overflows (SSO),

Reduce or eliminate system surcharging,

Eliminate wastewater service backups,

Reduce operation and maintenance costs, and

Increase reliability and continuity of wastewater service.

PROJECT OUTPUTS

Implementation of the Construction Activities Strategy

  • Rehabilitation and/or restoration of approximately 35 lift stations
  • Rehabilitation and/or restoration of approximately 5,800 linear feet of impaired sewer line
  • Repair of approximately 1,500 linear feet of pipe repair
  • Construction of approximately 5,800 linear feet of Cured in Place Pipe Liner
  • Slip lining of approximately 3,500 linear feet of the City’s main trunk line

Implementation of the Outreach Program Strategy

  • Webpage
  • Meetings

PROJECT OUTCOMES

Improved collection and transport of existing and future wastewater flows within the City of Cahokia Heights during both dry and wet weather conditions

Compliance with regulatory requirements for reserve capacity and prevention of prohibited SOSs, and

Improved customer wastewater service, including the reduction of frequency and duration of system surcharge events that cause basement or service backups

Public Meetings

City of Cahokia Heights Townhall #5

September 26, 2024 6:00pm

Agenda

City of Cahokia Heights Townhall #4
June 27, 2024 6:00pm
Agenda

City of Cahokia Heights Townhall #3
March 27, 2024 6:00pm
Agenda

City of Cahokia Heights Townhall #2
September 27, 2023 6:00pm
Agenda

City of Cahokia Heights Townhall
July 13, 2023 6:00pm
Agenda

Contact: Community Outreach Team
618-332-4207
communityoutreach@cahokiaillinois.org

Grant Documents

Prairie du Pont/Judy’s Branch Watershed-Based Plan Development and Pilot Demonstrative Best Management Practices Implementation

Grant Recipient – Heartlands Conservancy

Grant Period – March 19, 2020- March 31, 2023

Grantee Award – $919,868.74

Grantee Match – $99,522.47

Grant Total – $1,019,391.21

Prairie-Du-Pont-Watersheds-8X11-Copy-3-Scaled

The Prairie du Pont/Judy’s Branch Watershed-Based Plan Development and Pilot demonstrative Best Management  Practices Implementation Project (Project) will develop a watershed-based plan (Plan) for the approximate 95,000-acre project area which includes the Prairie du Pont watershed and the St. Clair County portion of the Judy’s Branch watershed. The Plan will be designed to improve water quality by controlling nonpoint source pollution. The Plan will be consistent with the 2013 US EPA watershed-based plan guidance and current watershed planning principles. The development of the Plan includes a significant outreach and information program which includes implementation of pilot demonstrative best management practices (BMP) for 1) traditional stormwater runoff control (TSRC) and 2) minor sewer system infrastructure issues (MSSI). The outreach and information program includes community-based efforts such as training, displays, and workshops, along with technical assistance.

The Plan will help to identify stormwater runoff control opportunities to reduce flood events in the watershed (home of Cahokia Heights and part of East St. Louis). The Plan will comply with State and federal guidelines to improve the chance to secure future technical and financial assistance from private, State, and federal organizations to implement the Plan once completed. A local Watershed Planning Committee (Committee) has been established – this Committee reflects the ‘personality’ of the watershed – including members of local active citizen groups and local, State, and federal entities, as appropriate. A Technical Advisory Committee (TAC) has been created to support the Committee in the development of the Plan. The TAC will make recommendations regarding the development of the Plan’s watershed resource inventory and the types of BMPs, including specific techniques and construction requirements, cost estimates, BMP lifespan, and operation and maintenance needs.

The Plan will document the existing watershed conditions (natural resources, land use, stakeholder concerns, etc.) and identify BMPs, activities, and programs that the watershed stakeholders are willing to support that can be implemented to help manage stormwater to reduce 1) the number of flood events, and shorten their duration, and 2) the Infiltration and Inflow (I&I) pressure on the wastewater collection and transport system(s). The Plan must include, at a minimum, nine specific elements required in US EPA’s watershed-based plan development guidance, including site-specific BMP recommendations, an implementation schedule, and identification of potential partners and funding sources to pursue to implement the Plan’s recommendations. The Project goal is to create the most optimal and cost-effective Plan to address the watershed’s stormwater runoff and flood event issues.

The second part of the Project is the implementation of demonstrative BMPs to reduce stormwater runoff and repair the wastewater collection and transport infrastructure.

PRAIRIE DU PONT PROJECT OUTPUTS

Implementation of Outreach and Information Strategy

Watershed-based plan that meets USEPA’s nine required elements

  • Watershed Resource Inventory
  • Executive Summary
  • Watershed-Based Plan Evaluation

PRAIRE DU PONT PROJECT OUTCOMES

Future implementation of the watershed-based plan recommendations

Reduced stormwater runoff and annual pollutant loadings to Prairie du Pont Creek and Judy’s Branch